-
Condition:
Factory New
-
Learn more:
-
MFR:
RPI
Ships from Manufacturer
- MPN: SDK020
- Phone: (800) 221-9723
+Free Shipping*
Shop with Confidence
Free Shipping
Free Returns
Sales Tax Exemption
+Dedicated Account Managers
Frequently asked questions
How often should I replace this PM-1 kit?
RPI recommends replacing this kit every 6 months to ensure the Vacuum Pump Assembly continues to perform at optimal efficiency.
Is this kit specifically designed for the STERRAD 100S?
Yes, the SDK020 PM-1 Kit is precision-engineered specifically for the STERRAD 100S model and its associated Vacuum Pump Assembly.
Can I purchase individual parts from the kit separately?
Yes, while the kit is designed for comprehensive maintenance, all individual components within the PM-1 kit are available for separate procurement if needed.
Why is this maintenance kit considered essential for my equipment?
This kit is vital for upholding FDA and OEM-specified maintenance schedules, which helps maintain overall system integrity and prevents operational downtime.
Does RPI offer maintenance kits for longer intervals?
Yes, for annual maintenance requirements, RPI provides the PM-2 Kit (Part #SDK060) to support your long-term equipment care strategy.
Are these components compatible with standard bulk sterilizers?
Yes, the SDK020 is designed to be compatible with Bulk Sterilizers and Endoscope Processing Systems that feature this specific vacuum pump configuration.
What if I also need to replace the chamber plastics?
If you are conducting broader maintenance, you can utilize the Chamber Plastics Kit (Part #SDK032), which is specifically available for those components.
Does this kit meet the OEM quality standards?
Absolutely. This is a Factory New kit designed to replace OEM part #05-06899-1-100, ensuring your system continues to run according to original manufacturer specifications.
Is the installation of this kit straightforward for routine maintenance?
The kit is intended for preventative maintenance protocols. It includes the necessary components to simplify the biannual service process for the vacuum pump assembly.
How can this kit help me maintain operational efficiency?
By adhering to the recommended 6-month replacement cycle, this kit ensures that the vacuum assembly remains free of wear, helping to prevent errors and maintain consistent sterilization performance.

RPI SDK020 Pm-1 Kit