- Condition: Factory New
-
Learn more:
- MFR: Sun Med Ships from MFI Medical
- MPN: 5-5233-02
Frequently asked questions
Is this blade compatible with my existing handles?
Yes, this blade is designed to integrate seamlessly with all standard fiberoptic laryngoscope handles.
Can this blade be used multiple times?
Yes, it is a reusable instrument. It is constructed from durable surgical-grade 303/304 stainless steel and is fully compatible with standard cleaning and sterilization protocols.
What is the primary benefit of the fiberoptic light?
The fiberoptic technology provides superior, focused illumination of the airway, which ensures better visibility and accuracy during intubation procedures compared to standard light sources.
Is this blade suitable for pediatric patients?
Absolutely. This is a Size 2 (Child) Miller-type blade. The geometry of the Miller profile is specifically optimized for pediatric airway management to ensure safe and efficient use.
What makes the Miller design preferred for children?
The Miller-type blade features a straight-edged profile that provides a clear, direct view of the airway, which is often preferred in pediatric applications to facilitate easier intubation.
Does the blade arrive sterile?
No, the blade is supplied non-sterile. It is intended to be processed through your facility’s standard sterilization cycles before its first use.
What material is used for the construction?
It is crafted from high-grade 303/304 stainless steel, ensuring it is both robust enough for demanding clinical environments and suitable for repeated sterilization.
Is any assembly required before use?
No complex assembly is required. The blade simply needs to be securely attached to your compatible fiberoptic laryngoscope handle to be ready for operation.
Where is this product typically used?
This blade is ideal for professional clinical settings, including:
- Hospital environments
- Emergency departments
- Pediatric anesthesiology suites
How long will it take to arrive?
This item ships directly from the manufacturer with an estimated lead time of 2 to 3 weeks.