- Condition: Factory New
- Weight: 0.14 lb
- 3 x 1 mL Calibrator 1, lyophilized
- 3 x 1 mL Calibrator 2, lyophilized
- Store refrigerated at 2° to 8°C (36° to 46°F)
- This item is non-returnable
-
Learn more:
- MFR: Alfa Wassermann Ships from Manufacturer
- MPN: S2-76
Frequently asked questions
Which systems is this calibrator kit compatible with?
This kit is specifically engineered for seamless integration with Alfa Wassermann ACE and ACE Alera clinical chemistry analyzers.
Does this kit cover the full TIBC assay calibration?
Yes, this kit includes a precise set of lyophilized calibrators (3 vials of Calibrator 1 and 3 vials of Calibrator 2) designed specifically for the calibration of Direct Total Iron-Binding Capacity (TIBC) assays.
What are the storage requirements for these vials?
To maintain the integrity and stability of the reagents, these vials must be stored refrigerated at 2° to 8°C (36° to 46°F) upon receipt.
Where should I look for specific concentration details?
Standard lab protocol requires that you consult the provided instructions for use included with the product, which contain the specific concentration details necessary for your setup.
Can I return this item if my needs change?
Please be advised that this diagnostic item is non-returnable.
Is this kit suitable for professional clinical use?
Yes, this is a professional diagnostic-grade product intended for in vitro diagnostic use, ensuring the high level of accuracy required in laboratory settings.
Why is the product provided in a lyophilized state?
The calibrators are lyophilized (freeze-dried) to ensure long-term stability and to maintain the diagnostic integrity of the reagents until the moment they are prepared for use.
How many vials are included in the kit?
The complete kit contains six 1 mL vials in total:
- 3 vials of Calibrator 1
- 3 vials of Calibrator 2
Is this product new or refurbished?
This is a factory new Alfa Wassermann product.
What is the typical shipping lead time?
This item ships directly from the manufacturer and typically has a lead time of 1-2 weeks.